
Under the slab
A rough-in set before the concrete goes down.
On a commercial build the plumbing goes in first. Drain and vent risers stand in trenched gravel between the steel studs, laid out to walls that do not exist yet, so the slab can be poured around them and every fixture lands where the drawings say.








